Where to start with the foundation process.
See the Excavation Process
Footers – We prepare and set footings. Stone to top of footer only
Radiant Heating – Installed prior to pouring the floor
Form a drain
Poured walls – prep wall, pour 8′ walls or 6′ walls incorporate window bucks and doorframes.
Floor – Poured floor with or without radiant heating
We use rebar reinforcements per spec (see proposal information)
Waterproofing can be an exterior waterproofing membrane, and others. (see proposal information.)
Additional items may be included: sonotubes per specs, Egress Windows, bilco door entrances